Incident History for Mabl

A complete log of all past incidents, outages, and scheduled maintenance.

Filter by status

applies to the 5 loaded
Login backend endpoint domain change underway

Completed

Affected Components

user interface

Completed

on Sep 29, 2026

The scheduled maintenance changing the login backend endpoint domain is now complete.

Under Maintenance

on Sep 29, 2026

Scheduled maintenance changing the login backend endpoint domain is now underway and expected to last five minutes.

Scheduled For

Sep 29, 2026, 1:00 PM UTC to Sep 29, 2026, 1:05 PM UTC

Steps dropped from browser tests saved between Sept 8 19:48 UTC and Sept 9 01:27 UTC

Resolved

Affected Components

test executiontest execution engineuser interface

Resolved

on Sep 10, 2026

The incident is now resolved; steps dropped from browser tests saved between Sept 8 and Sept 9 have been fixed.

Monitoring

on Sep 9, 2026

Repairs are complete for all affected tests except a few under customer coordination.

Identified

on Sep 9, 2026

A subset of browser tests saved in the mabl Trainer silently dropped certain step types. Engineering has identified affected tests and is contacting workspaces.

Planned maintenance for Link service complete

Completed

Affected Components

mabl linktest executiontest execution enginetest scheduling

Completed

on Sep 5, 2026

The planned mabl Link maintenance is now complete, having ended on 5 September 2026 at 15:09 UTC.

Under Maintenance

on Sep 5, 2026

Scheduled maintenance for the Link service is now underway and expected to last one hour.

Scheduled For

Sep 5, 2026, 3:00 PM UTC to Sep 5, 2026, 4:00 PM UTC

Login backend endpoint domain change

Scheduled

Affected Components

user interface

Scheduled

on Aug 28, 2026

The login backend endpoint domain will change due to a vendor upgrade, requiring firewall allowlist updates.

Scheduled For

Sep 29, 2026, 1:00 PM UTC to Sep 29, 2026, 1:05 PM UTC

Planned maintenance for Link service

Scheduled

Affected Components

test execution enginemabl linktest schedulingtest execution

Scheduled

on Aug 24, 2026

Connectivity to mabl Link will be briefly disrupted for SSL certificate rotation, potentially causing test failures.

Scheduled For

Sep 5, 2026, 3:00 PM UTC to Sep 5, 2026, 4:00 PM UTC

    Incident History for Mabl