Incident History for Mabl
A complete log of all past incidents, outages, and scheduled maintenance.
Filter by status
applies to the 5 loadedLogin backend endpoint domain change underway
Completed
Affected Components
Completed
on Sep 29, 2026
The scheduled maintenance changing the login backend endpoint domain is now complete.
Under Maintenance
on Sep 29, 2026
Scheduled maintenance changing the login backend endpoint domain is now underway and expected to last five minutes.
Scheduled For
Sep 29, 2026, 1:00 PM UTC to Sep 29, 2026, 1:05 PM UTC
Steps dropped from browser tests saved between Sept 8 19:48 UTC and Sept 9 01:27 UTC
Resolved
Affected Components
Resolved
on Sep 10, 2026
The incident is now resolved; steps dropped from browser tests saved between Sept 8 and Sept 9 have been fixed.
Monitoring
on Sep 9, 2026
Repairs are complete for all affected tests except a few under customer coordination.
Identified
on Sep 9, 2026
A subset of browser tests saved in the mabl Trainer silently dropped certain step types. Engineering has identified affected tests and is contacting workspaces.
Planned maintenance for Link service complete
Completed
Affected Components
Completed
on Sep 5, 2026
The planned mabl Link maintenance is now complete, having ended on 5 September 2026 at 15:09 UTC.
Under Maintenance
on Sep 5, 2026
Scheduled maintenance for the Link service is now underway and expected to last one hour.
Scheduled For
Sep 5, 2026, 3:00 PM UTC to Sep 5, 2026, 4:00 PM UTC
Login backend endpoint domain change
Scheduled
Affected Components
Scheduled
on Aug 28, 2026
The login backend endpoint domain will change due to a vendor upgrade, requiring firewall allowlist updates.
Scheduled For
Sep 29, 2026, 1:00 PM UTC to Sep 29, 2026, 1:05 PM UTC
Planned maintenance for Link service
Scheduled
Affected Components
Scheduled
on Aug 24, 2026
Connectivity to mabl Link will be briefly disrupted for SSL certificate rotation, potentially causing test failures.
Scheduled For
Sep 5, 2026, 3:00 PM UTC to Sep 5, 2026, 4:00 PM UTC